How to Plan Line Speed for Mixed Case Sizes

To plan line speed for mixed case sizes, map each case dimension to the slowest machine limit. Set the conveyor speed to the bottleneck, add buffers for changeovers, and verify the palletizer can accept the resulting load.
- Set line speed to the slowest machine limit in the sequence, not the average.
- Add changeover buffers when case sizes differ significantly.
- Check palletizer capacity against the slowest speed to prevent stalls.
- Verify the final speed with a timed run before committing to a target output.
Prerequisites: What you need before setting the speed
You need three documents before you start planning. The first is the case size list. List every case dimension that will run on the line, including width, height, and depth. Note the weight if it varies. A lightweight case of 500 grams behaves differently under the conveyor belt than a dense case of 5 kg. The weight affects the drive torque and can influence the acceleration time of the conveyor segments. If you have multiple SKUs, group them by footprint. A 300 mm by 200 mm footprint is the key measurement for the conveyor path.
The second is the machine data sheet. Pull the maximum throughput in cases per minute for each unit: the filler, case erector, side sealer, bottom sealer, and palletizer. Do not rely on the nominal rating printed on the machine nameplate if you have custom accessories. A case erector with a high-speed erector head may have a lower limit than the standard unit if the case height exceeds 300 mm. Check the specific model number and the configuration options installed on your floor.
The third is the conveyor layout. Measure the distance between each machine. This tells you how long a case takes to move from one station to the next. You need the physical distance in meters. You also need the conveyor speed rating for each section. If the line has a variable frequency drive (VFD) on the main conveyor, note the maximum speed the drive can maintain without slipping.
If you do not have these, you are guessing. A guess on a mixed line usually becomes a stoppage.
Step 1: Identify the bottleneck machine
Review the throughput limits for every machine on the line. The machine with the lowest maximum cases per minute is the bottleneck. All other machines must match that speed or slower. If the side sealer handles 18 cases per minute but the filler only handles 12, the line can never run above 12 cases per minute.
The reason for this step is simple. Speed is set by the weakest link, not the strongest. You cannot push the line faster than the slowest component allows.
Look at the filler first. If you are filling liquid products, the filling valve closing speed often dictates the rate. If you are filling powder or granules, the auger or vibratory feeder is the limit. For a case erector, the limit is usually the erector head speed and the case height. Tall cases take longer to be folded and stood upright. A sealer is often limited by the heat transfer time. If the heat seal requires 2 seconds of contact, and the conveyor moves at 0.5 m/min, you are limited to one case every 3 seconds, or 20 cases per minute. If the heat seal requires 4 seconds, the limit drops to 15 cases per minute.
Check the palletizer next. The palletizer has two limits: the infeed rate and the stack cycle time. If the palletizer can only stack one layer every 2 seconds, it can process 30 cases per minute if each layer holds 15 cases. If it takes 5 seconds per layer, the limit is 12 cases per minute.
Write down the lowest number from this list. That is your theoretical maximum for the entire line.
Step 2: Map each case size to its machine limit
Not all cases travel through a machine at the same rate. A tall case may take longer to pass through a side sealer than a short case. A wide case may require a slower conveyor to avoid a collision at the case erector.
Create a table. List each case size in one column. In the next column, write the maximum cases per minute that machine can handle for that specific size. Do this for every machine. You will likely find that the bottleneck changes from one case size to another.
This step prevents a common error: setting a single speed for all cases. A speed that works for small cases may crash the line on large ones.
Consider a case erector. It might handle 20 cases per minute for a 250 mm case. But for a 450 mm case, the erector head needs more time to fold the top flaps. The limit might drop to 12 cases per minute. The side sealer might handle 18 cases per minute for the small case, but only 14 for the large case due to the longer heat plate contact area.
You must build a matrix. Rows are case sizes. Columns are machines. The cell value is the maximum cases per minute for that specific combination.
Example:
Case A (Small): Filler 15, Erector 20, Side Sealer 18, Palletizer 12.
Case B (Large): Filler 12, Erector 12, Side Sealer 14, Palletizer 10.
For Case A, the bottleneck is the palletizer at 12.
For Case B, the bottleneck is the palletizer at 10.
If you run a mixed batch, you must plan for the slowest limit in the batch. If you run 50% small and 50% large, the average output will be limited by the large case speed if the machines cannot buffer the difference.
Step 3: Calculate the conveyor speed for each case size
The conveyor speed is measured in meters per minute or feet per minute. It is not the same as cases per minute. To convert, use the case length and the desired cases per minute.
If you want 12 cases per minute and each case is 0.3 meters long, the conveyor moves at 3.6 meters per minute. Multiply the cases per minute by the case length.
Set the conveyor speed to the slowest limit for that case size. If the side sealer limits you to 10 cases per minute for a tall case, and the case is 0.4 meters long, the conveyor speed is 4 meters per minute. Any faster and the cases stack up.
You must consider the case gap. Cases should not touch. A standard gap is 10 to 20 mm. Add this to the case length for the calculation. If the case is 0.3 m and the gap is 0.02 m, the pitch is 0.32 m. At 12 cases per minute, the conveyor speed is 12 x 0.32 = 3.84 m/min.
Check the conveyor belt tension. If the belt is too loose, it will slip under load, especially when the case is heavy. If the belt is too tight, it will wear the rollers and create noise. The belt width must be at least 20 mm wider than the case width to allow for lateral drift.
Step 4: Account for changeover time
When the line switches from one case size to another, there is a delay. The conveyor may stop. The operator may adjust guides. The machine may need a reset. This time is lost.
Add a buffer. If you expect one changeover per hour, and each changeover takes 10 minutes, you lose 10 minutes of potential output. To keep the actual output on target, you must run the line slightly faster during the stable periods.
The reason for this step is that average speed is not enough. You need to plan for the dips. A line that runs at 12 cases per minute for 50 minutes and stops for 10 minutes produces less than a line that runs at 13 cases per minute for 50 minutes.
Calculate the actual output. If your target is 1,000 cases per hour, and you lose 10 minutes to changeover, you have 50 minutes to produce 1,000 cases. That requires a rate of 20 cases per minute. If your bottleneck is 12 cases per minute, you cannot meet the target. You must either reduce the target or reduce the changeover time.
Reduce changeover time by using quick-change guides. Use pre-set templates. Train operators to adjust the guides while the line is running, if safe.
Step 5: Check the palletizer capacity
The palletizer is often the last machine, but it can be the first to fail. It must accept cases at the speed the line produces. If the line delivers 12 cases per minute but the palletizer can only load 10 cases per minute, a queue builds up. That queue backs through the side sealer and stops the filler.
Check the palletizer data sheet. Find the maximum load rate. Compare it to your calculated line speed. If the palletizer is slower, it becomes the new bottleneck. You may need to add a buffer conveyor before the palletizer. This buffer absorbs the difference and keeps the upstream machines running.
The buffer conveyor should be at least 2 meters long. If the line runs at 4 m/min, the buffer holds 30 seconds of product. This is enough to cover a minor palletizer fault or a stack adjustment.
Check the palletizer stack height. If the stack is too high, the palletizer may drop the next case. This causes a jam. Keep the stack height below the recommended maximum.
Step 6: Set the speed and run a timed test
Set the line to the calculated speed. Run a full batch of the smallest case size. Time 100 cases. Calculate the actual cases per minute. Compare it to the target. If the actual is lower, find the cause. Is the conveyor slipping? Is a sensor missing a case? Is the machine stopping for a minor fault?
Then switch to the largest case size. Repeat the test. You are looking for a speed that holds up across the range. If the large case drops the line to 8 cases per minute, your plan must reflect 8, not 12.
Use a stopwatch for the first run. After that, use an optical sensor counter. Count 100 cases. Record the time. Calculate the rate. Repeat three times. Take the average.
Check the error rate. If 5 out of 100 cases are misaligned, your speed is too high. Slow down the conveyor by 5%.
Step 7: Document the speed settings
Write the settings down. Save the conveyor speed for each case size in a file. Save the machine limits. Save the changeover time. Post it at the line.
The reason for this step is consistency. Operators often reset machines to default values after a fault. If the default is not the planned speed, the line runs off plan. A written record keeps the line stable and makes troubleshooting easier.
Create a one-page sheet. List the case size, the target speed, the conveyor speed, and the machine settings. Include the changeover procedure. Post it on the machine guard.
Common mistakes
The first mistake is using the average case size. If you have 80 small cases and 20 large cases, the average length is close to the small case. But the large case sets the speed limit for the entire run. You must plan for the worst case.
The second mistake is ignoring the buffer. Many lines have no buffer between the sealer and the palletizer. When the palletizer slows for a stack adjustment, the whole line stops. A short buffer conveyor, even 2 meters long, can absorb 10 to 15 seconds of delay.
The third mistake is changing the speed on the fly. If the operator sees a queue building, they speed up the conveyor. This creates a collision. The queue is a signal, not a problem to solve by pushing harder. The fix is to slow down upstream, not speed up downstream.
Final verification
Before you commit to the line, run the full sequence. Start with the smallest case. Run for 30 minutes. Then switch to the largest case. Run for 30 minutes. Then switch back. Time each segment. Check the palletizer stack height. Check the conveyor for slippage.
If the output matches your plan, the line speed is set. If it does not, go back to Step 1. The bottleneck may have shifted. The data will tell you where the loss is.
| Case Size | Machine Limit (cases/min) | Conveyor Speed (m/min) | Palletizer Limit (cases/min) | Final Line Speed (cases/min) |
|---|---|---|---|---|
| Small (0.25 m) | 15 | 3.75 | 12 | 12 |
| Medium (0.35 m) | 12 | 4.2 | 12 | 12 |
| Large (0.45 m) | 10 | 4.5 | 10 | 10 |
- Identify the bottleneck machine from the data sheets.
- Map each case size to its specific machine limit.
- Calculate the conveyor speed in meters per minute.
- Add changeover buffers to the total run time.
- Verify the palletizer can accept the line output.
- Run a timed test on each case size.
- Document the final settings at the line.
Frequently asked questions
Can I run different case sizes at different speeds on the same line?
Yes. Set the conveyor speed for each case size based on its machine limits. Change the speed when you switch sizes. Use a changeover buffer to cover the delay.
What if the palletizer is slower than the filler?
The palletizer becomes the bottleneck. The line speed is set by the palletizer. Add a buffer conveyor before the palletizer to absorb the difference and keep the filler running.
How do I calculate conveyor speed from cases per minute?
Multiply the cases per minute by the length of the case in meters. This gives the conveyor speed in meters per minute. Use the slowest machine limit for that case size.
Do I need a buffer conveyor for small changes in case size?
If the change is small and the machines adjust quickly, a buffer may not be needed. If the change is large or the changeover takes more than a few seconds, add a buffer.
What should I do if the line stops during a timed test?
Record the stop time and the cause. Check if it is a sensor, a guide, or a mechanical fault. Adjust the plan to account for that loss. Do not ignore it.